{"kind":"task","effective_mode":"full","benchmark":{"kind":"benchmark","effective_mode":"full","slug":"hellaswag","formal_name":"HellaSwag","introduction":"HellaSwag asks which of four continuations naturally follows a sentence or a video caption. The wrong options are produced by adversarial filtering, so items that are nearly trivial for people remain hard for models.","introduction_ja":"","introduction_en":"","category":"Category not supplied","task_count":null,"acquisition_status":"Acquisition status not supplied","official_url":"https://rowanzellers.com/hellaswag/","indexing_mode":"index","profile":{"resources":[],"task_format":"","scoring":"","metric":"","size":"","answer_access":"","license":"","citation":"","maintainer":"","released":"","why_hard":"","related":[],"history":"","construction":"","limitations":"","saturation":"","scores":[]}},"task_id":"220ed01a-f3f1-52b1-9a19-eac516cdfa79","task_key":"default--validation--4118","task_revision_id":"1","upstream_id":"4118","short_description":"HellaSwag validation 4118","config":"default","split":"validation","body":"{\"activity_label\":\"Home and Garden\",\"ctx\":\"[header] How to install a window well [title] Take your prefabricated window well and place it against your ground-level window to get an idea of the area you need to dig out. [step] Mark a perimeter of about 6 inches (or 15 cm) around the well with your shovel as a guide for digging. [title] Dig your hole.\",\"endings\":\"['[step] With your clay-head shovel, begin digging into the ground about 3 feet (0.91 m) deep, at a 45 degree angle. Continue digging in a row to ensure your hole is even with the outside of the window well.', '[step] If you are digging down using a tractor, with a hoe, or with a box hoe, you may need to start with the underside of the box hoe. Be sure that you do not dig into anything on top of the hole.', '[step] Use long, metal nail which you can get at auto parts stores. Dig at a wide depth, often about 2 feet (0.6 m), and never bury more than 3 inches (7.6 cm) deep.', '[substeps] The top of the well should sit about 6 inches (or 15 cm) above the ground. You should also allow about 4 inches (or 10 cm) for gravel beneath the well.']\"}","display_format":"text","language":"","answer_status":"published","assets":[],"source_url":"https://rowanzellers.com/hellaswag/","history":"initial import","indexing_mode":"index","subproblems":[],"grids":[]}