{"kind":"task","effective_mode":"full","benchmark":{"kind":"benchmark","effective_mode":"full","slug":"mmlu-pro","formal_name":"MMLU-Pro","introduction":"MMLU-Pro rebuilds MMLU with ten answer options instead of four and removes items that no longer separate models. Questions span fourteen academic and professional subjects.","introduction_ja":"","introduction_en":"","category":"Category not supplied","task_count":null,"acquisition_status":"Acquisition status not supplied","official_url":"https://huggingface.co/datasets/TIGER-Lab/MMLU-Pro","indexing_mode":"index","profile":{"resources":[],"task_format":"","scoring":"","metric":"","size":"","answer_access":"","license":"","citation":"","maintainer":"","released":"","why_hard":"","related":[],"history":"","construction":"","limitations":"","saturation":"","scores":[]}},"task_id":"50592853-14a5-53ec-bc6d-cd3c25f2dec3","task_key":"default--test--8322","task_revision_id":"1","upstream_id":"8322","short_description":"A planning engineer for a new alum plant must present some estimates to his…","config":"default","split":"test","body":"{\"category\":\"math\",\"options\":\"['10.5 $\\\\\\\\mathrm{h}$', '15.7 $\\\\\\\\mathrm{h}$', '16.4 $\\\\\\\\mathrm{h}$', '9.8 $\\\\\\\\mathrm{h}$', '13.3 $\\\\\\\\mathrm{h}$', '14.0 $\\\\\\\\mathrm{h}$', '8.5 $\\\\\\\\mathrm{h}$', '11.2 $\\\\\\\\mathrm{h}$', '12.6 $\\\\\\\\mathrm{h}$', '7.2 $\\\\\\\\mathrm{h}$']\",\"question\":\"A planning engineer for a new alum plant must present some estimates to his company regarding the capacity of a silo designed to contain bauxite ore until it is processed into alum. The ore resembles pink talcum powder and is poured from a conveyor at the top of the silo. The silo is a cylinder $100 \\\\mathrm{ft}$ high with a radius of $200 \\\\mathrm{ft}$. The conveyor carries ore at a rate of $60,000 \\\\pi \\\\mathrm{~ft}^3 / \\\\mathrm{h}$ and the ore maintains a conical shape whose radius is 1.5 times its height. If, at a certain time $t$, the pile is $60 \\\\mathrm{ft}$ high, how long will it take for the pile to reach the top of the silo?\",\"src\":\"scibench-calculus\"}","display_format":"text","language":"","answer_status":"published","assets":[],"source_url":"https://huggingface.co/datasets/TIGER-Lab/MMLU-Pro","history":"initial import","indexing_mode":"index","subproblems":[],"grids":[]}